Tap / click on image to see more RealViewsTM
Sale Price CA$36.18.  
Original Price CA$40.20 per shirt
You save 10%

Respect Is Earned Value T-Shirt

Qty:
  1. Size

  2. Style

  3. Colour & Print Process: White

    Classic Printing: No Underbase
    Vivid Printing: White Underbase

Other designs from this category

About T-Shirts

Sold by

Style: Men's Value T-Shirt

This classic silhouette is an affordable alternative heavyweight t-shirt for the value-conscious consumer. Rest assured as this t-shirt is pre-shrunk and made from 100% cotton. It also has double-needle stitched bottom and hems for extra durability. Select a design from our marketplace or customize it and unleash your creativity!

Size & Fit

  • Model is 183 cm and is wearing a medium
  • Standard fit
  • Fits true to size

Fabric & Care

  • 5.4 oz. 100% cotton
  • 1x1 rib knit collar and shoulder-to-shoulder taping
  • Double-needle hem
  • Imported
  • Machine wash cold

About This Design

Respect Is Earned Value T-Shirt

Respect Is Earned Value T-Shirt

Customer Reviews

4.7 out of 5 stars rating32.9K Total Reviews
25778 total 5-star reviews4991 total 4-star reviews1126 total 3-star reviews509 total 2-star reviews501 total 1-star reviews
32,905 Reviews
Reviews for similar products
5.0 out of 5 stars rating
5 out of 5 stars rating
By Alex D.November 19, 2021 • Verified Purchase
Value T-Shirt, White, Small
Zazzle Reviewer Program
Honestly, I was pooping and scrolling through tiktok when I ran into a video of someone ordering them. I ordered them right then and there and it came pretty damn fast. The quality of the shirt is also immaculate, doesn’t feel like a shirt you’d probably use for a rag once it rips once. Amazing. That’s it. Just amazing.
5.0 out of 5 stars rating
5 out of 5 stars rating
By Thomas G.July 17, 2022 • Verified Purchase
Basic T-Shirt, Grey, Large
Zazzle Reviewer Program
I love this shirt, it makes me smile whenever I wear it. The print is perfect
5.0 out of 5 stars rating
5 out of 5 stars rating
By Thomas G.June 6, 2022 • Verified Purchase
Short Sleeve T-Shirt, Kelly Green, Large
Zazzle Reviewer Program
I really love this shirt and all the other shirts I have bought. They always bring a smile to my face when putting them on. I will definitely be buying more! The printing was perfect as usual.

Other Info

Respect Is Earned Value T-Shirt
Product ID: 235229525103720587
Designed on 2017-03-14, 4:40 p.m.
Rating: G