Tap / click on image to see more RealViewsTM
Sale Price CA$2.79.
Original Price CA$3.98 per card
You save 30%
Project Management Where 'critical path' is not Thank You Card
Qty:
Corner Style
Squared
+CA$0.35
Paper Type
Signature Matte
18 pt thickness / 120 lb weight Soft white, soft eggshell texture
+CA$1.00
-CA$0.30
About Flat Thank You Cards
Sold by
About This Design
Project Management Where 'critical path' is not Thank You Card
project manager gift
Store
Customer Reviews
4.7 out of 5 stars rating3.8K Total Reviews
3,838 Reviews
Reviews for similar products
5.0 out of 5 stars rating
5 out of 5 stars ratingBy Tina A.December 22, 2024 • Verified Purchase
Flat Thank You Card, Size: 8.9 cm x 12.7 cm, Paper: Signature Matte, Corner: Squared, Print Quality: Standard, Envelopes: White
Beautiful and excellent quality! Canada Post made this order become delayed but I eventually got them and mailed them out right away. Thanks so much! .
2.0 out of 5 stars rating
2 out of 5 stars ratingBy Taylor A.July 10, 2024 • Verified Purchase
Flat Thank You Card, Size: 8.9 cm x 12.7 cm, Paper: Signature Matte, Corner: Squared, Print Quality: Standard, Envelopes: White
The cards are nice, smaller than I thought, and they came mis printed in my opinion. The one side of it had a white line down the photo and therefore set the writing off centre on the back. I wanted to return but I already waited for them and want these sent out for my wedding thank you, so I’m dealing with it.
. The card printed a line and through the entire thing off centre, not happy but need to send them out so cannot reorder
Also the print has it so you flip over and it’s upside down, it logically doesn’t make sense to flip up and down instead of left to right or right to left.
5.0 out of 5 stars rating
5 out of 5 stars ratingBy Kyler T.August 14, 2021 • Verified Purchase
Flat Thank You Card, Size: 8.9 cm x 12.7 cm, Paper: Signature Matte, Corner: Squared, Print Quality: Standard, Envelopes: White
Zazzle Reviewer Program
Such an easy, user friendly design portal. Shipping was fast and everything arrived earlier than expected. Highly recommend for thank you cards etc etc!! Picture and printing turned out as shown on the site and quality of the photo on the thank you cards was very high quality!!
Tags
Other Info
Product ID: 256478791843338543
Designed on 2023-11-27, 9:55 AM
Rating: G
